Photograph source
Image from the listing gallery in Rionegro. Source: a&h Real Estate.
7,900 m² Llanogrande plot with its municipality unresolved
Rionegro, Antioquia
Plot description
This offering advertises 7,900 m² in the Llanogrande sector at COP 1,975,000,000. Its title and description refer to El Retiro, while the city fields and catalogue place it in Rionegro; the municipality and exact location remain unresolved. The source describes a rural residential setting within native woodland, with vegetation, a water spring and panoramic views. The subdivision is presented as having 25 plots described as independent, 24-hour security, closed-circuit television, paved access and public transport nearby. What independence means and the scope of the facilities require clarification. The advertiser claims there are no water-table or dampness problems without supplying a technical study here. It estimates 12 minutes to the airport and 40 minutes to Medellín via Palmas, with Eafit Llanogrande nearby. The listing records socioeconomic stratum 5 and construction year 2021 and repeats 7,900 m² as built area without identifying buildings. Built area, technical ground conditions and utility connections are not confirmed.
Location
- Neighborhood or rural district
- Llanogrande
- Municipality
- Rionegro
- Surroundings
- A countryside setting according to the published listing.
Area reference, not the exact plot location.
Details to help you decide.
When a detail is not known, you can ask the team to request it. The response depends on the information and documents available.
Area and terrain
Location and access
- Neighborhood or rural district
- Llanogrande
- Sector
- Not known
- Surroundings
- A countryside setting according to the published listing.
- Reported distance to Medellín
- Not known
- Elevation
- Not known
- Access road
- Access via a paved road according to the listing.
- Road condition
- Not known
- Vehicle access
- Not known
- Public transport
- Not known
Utilities and water
Price and expenses
Use and construction
Documents and conditions
Review what matters.
Publication does not certify ownership, buildability or permitted use. Request plot-specific documents and confirm rules with the competent authority before committing.
Prepare your plot research