Photograph source
Image from the listing gallery in Rionegro. Source: a&h Real Estate.
El Caney plot in a development with a lake and stream
Rionegro, Antioquia
Plot description
This plot in a gated development in El Caney, San Antonio de Pereira, Rionegro, is offered for COP 580,000,000. The narrative states 1,106.89 m², while the land field gives 1,138 m². The discrepancy leaves the exact area pending checks; registered and measured areas are unknown. The advertised stratum is 6. The source places the development 10 minutes from San Antonio de Pereira’s main park, near schools, supermarkets, pharmacies and the urban area, with transport routes. It describes a countryside residential setting surrounded by woodland and nature, away from noise, with green areas and panoramic views. A gatehouse, a lake and a small stream at the entrance are advertised. The advertiser says the plot will be handed over with water, electricity and sewerage, with a wastewater treatment plant and paved roads to be delivered. These are advertised delivery conditions, not proof of completed works or operating connections. The built-area field repeats 1,138 m² without identifying a building; actual construction is unknown. The source treats areas and prices as estimates subject to change, images as illustrative and final details as those in the deed. Negotiation is in Colombian pesos; any dollar amount is a reference using the day’s exchange rate.
Location
- Neighborhood or rural district
- San Antonio De Pereira
- Municipality
- Rionegro
- Surroundings
- A countryside setting according to the published listing.
Area reference, not the exact plot location.
Details to help you decide.
When a detail is not known, you can ask the team to request it. The response depends on the information and documents available.
Area and terrain
Location and access
Utilities and water
Price and expenses
Use and construction
Documents and conditions
Review what matters.
Publication does not certify ownership, buildability or permitted use. Request plot-specific documents and confirm rules with the competent authority before committing.
Prepare your plot research