Photograph source
Image from the listing gallery in Medellín. Source: Fincaraíz.
Plot advertised in La Honda, Santa Elena; area unconfirmed
Medellín, Antioquia
Plot description
The source advertises a plot for sale at COP 1,110,120,000 in Santa Elena, Medellín. The sector field says Media Luna while the description specifies La Honda rural district; the precise reference needs clarification. The text advertises a minimum of 10,092 m² per plot without confirming the exact area of this property. According to the advertiser, it lies within the Río Nare Protective Forest Reserve and beside EPM protective woodland, with open views towards native forest. Walking, horseback riding along trails and birdlife are described as activities and features of the surroundings. The stated distance is 32 km from Medellín via the Eastern Tunnel road. The original publication ends incompletely after that reference. The source lists drinking-water, electricity, agricultural-water and fibre-optic connections, an electric entrance gate, a staffed gatehouse and a vehicle access road with wheel tracks; service operation and capacity are unverified. The advertiser claims residential, agricultural/livestock, silvopastoral, forestry, aquaculture, fish-farming and recreational uses, and a dwelling occupying up to 20% of gross land area. These claims require planning and environmental review, particularly given the stated reserve location. The source records socioeconomic stratum 5 and used condition. Built, registered and measured areas and actual permissions remain unconfirmed.
Location
- Neighborhood or rural district
- Santa Elena, Media luna
- Municipality
- Medellín
Area reference, not the exact plot location.
Details to help you decide.
When a detail is not known, you can ask the team to request it. The response depends on the information and documents available.
Area and terrain
Location and access
Utilities and water
Price and expenses
Use and construction
Documents and conditions
Review what matters.
Publication does not certify ownership, buildability or permitted use. Request plot-specific documents and confirm rules with the competent authority before committing.
Prepare your plot research