Photograph source
Image from the listing gallery in La Ceja. Source: a&h Real Estate.
1,859 m² El Tabor plot within an advertised 19-plot development
La Ceja, Antioquia
Plot description
In El Tabor, on the road from La Ceja towards La Unión, this offering records 1,859 m² and COP 588,522,600. According to the advertisement, it belongs to a condominium of 19 serviced plots ranging from 1,280 to 2,072 m², 5 km from La Ceja’s town centre. A rural residential setting, panoramic views, paved access and nearby public transport are described. The project advertises a 24-hour gatehouse, perimeter enclosure, paved internal roads, underground utility networks and installations and supply to each plot as future conditions. It also envisages ecological trails, a fire pit and delivery of 17 thousand m² of project-wide woodland; this should not be confused with the plot’s private area. The source claims an urban-development licence and Cornare permits to build drinking-water and wastewater treatment plants. Documents, validity, scope and execution require verification without assuming that plants or networks are already operational. The listing records socioeconomic stratum 4, construction year 2022 and repeats 1,859 m² as built area without identifying works. Information is stated to be subject to change.
Location
- Neighborhood or rural district
- Sector El Tabor
- Municipality
- La Ceja
- Surroundings
- A countryside setting according to the published listing.
Area reference, not the exact plot location.
Details to help you decide.
When a detail is not known, you can ask the team to request it. The response depends on the information and documents available.
Area and terrain
Location and access
- Neighborhood or rural district
- Sector El Tabor
- Sector
- Not known
- Surroundings
- A countryside setting according to the published listing.
- Reported distance to Medellín
- Not known
- Elevation
- Not known
- Access road
- Access via a paved road according to the listing.
- Road condition
- Not known
- Vehicle access
- Not known
- Public transport
- Not known
Utilities and water
Price and expenses
Use and construction
Documents and conditions
Review what matters.
Publication does not certify ownership, buildability or permitted use. Request plot-specific documents and confirm rules with the competent authority before committing.
Prepare your plot research